|
|
|
Process
Plant Layout And Piping Design |
|
Module
1 : The Basics of Plant Layout Design |
|
The
Plant Layout Designer |
|
Project
Input Data |
|
Basic
Layout Philosophy |
|
Abbreviations,
Standards, and Terminology |
|
Module
2 : Plant Layout Specification |
|
The
Components of Specification |
|
Module
3 : Plot Plans |
|
The
Plot Plan in the Process Unit |
|
Definition |
|
Plot
Plan Development |
|
Types
of Plot Plans |
|
Equipment
Location |
|
Pipe
Racks |
|
Roads,
Access Ways, and Paving |
|
Buildings |
|
Equipment
Spacing |
|
Sample
Plot Plan Arrangement |
|
Back
To Top Page |
|
Module
4 : Compressors |
|
Auxiliary
Equipment |
|
Centrifugal
Compressors : Nozzle Orientations |
|
Types
of Compressor Drives |
|
Lube
Oil System |
|
Seal
Oil System |
|
Surface
Condensers and Auxiliary Equipment |
|
Compressor
Maintenance |
|
Compressor
Arrangement and Location |
|
Elevations
of Machines |
|
Inter–
and After–Coolers |
|
Housing
and Platform Requirements |
|
General
Compressor Layout |
|
Back
To Top Page |
|
Module
5 : Drums |
|
Types
of Drums. |
|
Location
of Drums, Nozzle Locations |
|
Platform
Arrangements |
|
Piping
Arrangements |
|
Drum
Instrumentation |
|
Maintenance |
|
Further
Considerations |
|
Module
6 : Exchangers |
|
Exchanger
Construction |
|
Exchanger
Location and Support |
|
Nozzle
Orientation |
|
Exchanger
Piping |
|
Exchanger
Maintenance |
|
Back
To Top Page |
|
Module
7 : Furnaces |
|
Basic
Operation and Primary Parts of a Furnace |
|
Types
of Furnaces |
|
Terminology |
|
Burners |
|
Combustion
Air Preheating Systems |
|
General
Arrangement of Furnaces |
|
Piping
Layout for a Furnace |
|
Tail
Gas Incinerator and Waste Heat Unit |
|
Module
8 : Pumps |
|
Pump
Terminology |
|
NPSH
Requirements |
|
Types
of Pumps |
|
Pump
Locations |
|
Pump
Piping |
|
Pump
Piping Supports |
|
Module
9 : Reactors |
|
Process
Operation |
|
Design
Considerations for Reactors |
|
Location
of Reactors |
|
Support
and Elevation |
|
Nozzle
Locations and Elevations |
|
Platform
Arrangements |
|
Piping
Arrangements |
|
Maintenance |
|
Back
To Top Page |
|
Module
10 : Towers |
|
The
Distillation Process |
|
Types
of Towers |
|
Design
Considerations for Towers |
|
Tower
Elevation and Support |
|
Nozzle
Elevation and Orientation |
|
Platform
Arrangements |
|
Tower
Piping |
|
Tower
Instruments |
|
Maintenance |
|
Module
11 : Pipe Racks |
|
Establishing
Width, Bent Spacing, and Elevations |
|
Setting
Line, Valve, and Instrument Locations |
|
Pipe
Flexibility and Supports |
|
Structural
Considerations |
|
Other
Considerations |
|
Back
To Top Page |
|
Module
12 : Structures |
|
Design
Features. Structural Terms |
|
Structural
Details |
|
Small
Structures |
|
Medium–Sized
Structures |
|
Large
Structures |
|
Stair
Structures |
|
Drill
Structures |
|
Operations
Platforms |
|
Module
13 : Underground Piping |
|
Industry
Standards |
|
Terminology |
|
Types
of Systems |
|
Construction
Materials |
|
Oily
Water and Storm Water Systems |
|
Chemical
and Process (Closed) Sewers |
|
Process
and Potable Water |
|
Fire
Water System |
|
Underground
Electrical and Instrument Ducts |
|
Underground
Details |
|
Double
Containment–Underground Systems |
|
Fabrication |
|
Underground
Composite |
|
Back
To Top Page |
|
Module
14 : Instrumentation |
|
Types
of Instruments |
|
Instrument
Locations |
|
Miscellaneous |
|
Module
15 : Process Liquid Storage Tanks |
|
Codes
and Regulations |
|
Terminology |
|
Types
of Tanks |
|
Spill
Containment |
|
Dike
Access |
|
Sizing
Tanks and Dikes |
|
Tank
Details |
|
Tank
Supports |
|
Module
16 : Stress Analysis |
|
Introduction
to Piping Stress |
|
Pipe
Stress Analysis Work Process |
|
Impacts
of Excessive Pipe Stress |
|
Causes
of Pipe Stress |
|
Layout
Solutions for Weight Stress |
|
Layout
Solutions of Thermal Loads |
|
Layout
Solutions for Other Stress |
|
Back
To Top Page |
|
Module
17 : Computer-Aided Design |
|
Basic
CAD Applications |
|
Integrated
Modeling Systems |
|
Systems
Engineering and Instrument Design |
|
CAD
Benefits Summary |
|
Electronic
Spool Sheets |
|
Back
To Top Page |